Utility scale battery energy storage systems. Provides that a person may not:
Sets forth information that must be included in an application to the department for approval of the construction or expansion of a BESS. Provides that:
Provides that the total capacity of the batteries contained within a single enclosure in:
Provides that if a BESS installed after June 30, 2023, is located less than 1/2 mile from the nearest 100 year flood plain, all of the system's equipment must be located at least two feet above the 100 year frequency flood elevation. Requires the operator of a BESS to:
Authorizes the commission to adopt rules to specify standards for the installation and operation of a BESS. Provides that the commission's rules:
Requires the department to issue to the interim study committee on energy, utilities, and telecommunication, not later than November 1, 2023, a report regarding the progress of the commission in adopting rules addressing the installation and operation of a BESS.